To connect all the together, use the procedure of chaining directly from connection point to connection point.
The total length to be taken into consideration is the sum of the lengths of the different cables running from the PLC.
Where a single IP67 segment is used, each end of the segment must be connected to an end of line adaptor (TSX EF ACC 7 for IP67 modules).